This year the pollen was rather late in arriving, but when it did it came with a vengeance! For most of my life I’ve been allergy-free, but no longer. The pollen not only made us miserable, it kept leaving a dusting of yellow on the back porch.
So we decided to remodel the porch into a 3-season room, with casement windows, electric baseboard heat, and a through-the-wall air conditioner. Today was Day 1, and what a difference a day makes! Every day that something gets done, and there will be gaps, I’ll try to post some pictures.
Click to enlarge