Pratt Porch Project – Day 2

Not a whole lot is different today, because our contractor could work only in the morning. He ripped out all of the wall board that was projecting into the porch. He called it a “70’s-style flare-out.” The building code requires that the exhaust vent from the over-stove microwave oven, to the left of the sliding glass door, be re-routed to the roof.

Pratt Porch Day 2 Pratt Porch Day 2

Click to enlarge

That’s fiberglass on the porch roof, by the way. We’ll be getting a proper roof, with a skylight on each side. See that other dated decoration, inside of the house? The geometric room divider? We’ll get rid of that in a future remodeling project.